- ASpect’s Client: Hunter Water Australia
- Head Client: Hunter Water
- Plant Configuration: MLE, MUCT, Joburg, Bardenpho, Phoredox
- Plant Size: 22,000 EP
- Project Value: $25k (ASpect Fee $19k)
- Project Duration: April 2006 to September 2007
Options and Strategy Study for the 4.8 ML/d Farley WWTW, with HWA for Hunter Water Corporation (NSW).
