EPA Expert Witness

  • ASpect’s Client: NSW EPA
  • Head Client: NSW EPA
  • Plant Configuration: IDEA
  • Plant Size: 8,000 EP
  • Project Value: $6k (ASpect Fee $6k)
  • Project Duration:  June 2003 to July 2003

Expert witness advice for the NSW EPA (STP confidential).

The NSW EPA were investigating the grounds for prosecution of a facility that had apparently breached its license limits. The facility was not unique, but the conditions it was subjected to on a seasonal basis, both climatic and loading were unique, and had repeatedly led to difficulties in maintaining a stable and robust process. ASpect was asked to provide specialist process advice as the basis for possible prosecution. The tasks involved a review of the sizing, operational set-up, loading, operations response, mitigation measures, and technical report preparation. Very tight time frames were met in the preparation of the report.